郑律师事务所

what we offer
Site Plan
-
Site Analysis
-
Zoning Review
-
Code Review
-
Energy Review
Interior Design
-
Lighting
-
Space planning
-
Function and flow consultation
-
Furniture design and layout
Architecture
-
Schematic design
-
Design development
-
Construction documents
Code Compliance
-
Building Code & Zoning Ordinance review
-
Public hearing
-
ECB Violation Removal
-
Curb Cut Design
-
Special Construction Inspection TR1
-
Sign-off Inspection
Engineering
-
Structural Engineering
-
HVAC Engineering
Building Management
In NYC, Co-operatives and Condo Units can have their own Alteration Agreements, House Rules, and policies set in place. Co-op/Condo Boards, and Building Management will want to see a scope of work ensuring waterproofing requirements.
Selecting the right General Contractor with the required licenses, certifications, and insurances can be one of the Building's requirements.